Assoicate Professor--Industrial System Optimization Laboratory

Contact details

Address
LOSI- UTT * 12 rue Marie Curie * CS 42060 * 10004 TROYES CEDEX
Phone
0325715630
Office
G105
Email
faicel.hnaien@utt.fr

Teaching

  • Project management
  • Operation research
  • Production research managent
  • Simulation
  • Graph Theory and Management project at UTSEUS (Shanghai)
  • Scheduling
  • SAP

Research Interests

  • Planning and  inventory control under uncertainties
  • Scheduling with maintenance
  • Optimization in wireless sensor networks

Publications

Google Scholar : https://scholar.google.fr/citations?user=9r7dXn8AAAAJ&hl=fr

  • 1 Pattern
  • 30 refereed journal papers
  • 3 book chapters
  • 72 conferene papers

Refereed Journal Papers (10 most recent)

  1. Afsar, H.-M., Ben-Ammar, O., Dolgui, A., and Hnaien, F. (2020). Supplier repla-cement model in a one-level assembly system under lead-time uncertainty.AppliedScience, 10(3366) :1–21.
  2. Ho, M. H., Hnaien, F., and Dugardin, F. (2020). Electricity cost minimisation foroptimal makespan solution in flow shop scheduling under time-of-use tariffs.Interna-tional Journal of Production Research, pages 1–27 (JCR).
  3. Borodin, V., Bourtembourg, J., Hnaien, F., and Labadie, N. (2019). Cots softwareintegration for simulation optimization coupling : case of arena and cplex products.International Journal of Modelling and Simulation, 39(3) :178–189 (JCR).
  4. Benttaleb, M., Hnaien, F., and Yalaoui, F. (2018). Two-machine job shop problemunder availability constraints on one machine : Makespan minimization.Computers& Industrial Engineering, 117 :138–151 (JCR).
  5. Borodin, V., Snoussi, H., Hnaien, F., and Labadie, N. (2018). Signal processing ongraphs : Case of sampling in paley–wiener spaces.Signal Processing, 152 :130–140(JCR).
  6. Benttaleb, M., Hnaien, F., and Yalaoui, F. (2019). Minimising the makespan in thetwo-machine job shop problem under availability constraints.International Journalof Production Research, 57(5) :1427–1457 (JCR).
  7. Murat Afsar, H. and Hnaien,F. (2019). Formulations and solution algorithms fordynamic assembly routing problem.International Journal of Production Research,pages 1–18 (JCR).
  8. Hnaien,F. and Murat, A. (2017). Robust single-item lot-sizing problems withdiscrete-scenario lead time.International Journal of Production Economics,185 :223 – 229 (JCR).
  9. Borodin, V., Bourtembourg, J., Hnaien,F., and Labadie, N. (2016a). Handlinguncertainty in agricultural supply chain management : A state of the art.EuropeanJournal of Operational Research, 254(2) :348 – 359 (JCR).
  10. Borodin, V., Dolgui, A., Hnaien,F., and Labadie, N. (2016b). Replenishment plan-ning for single level assembly system under random component lead times : a chanceconstrained programming approach.International Journal of Production Economics(JCR)